Bathroom
The customer wanted a completely new bathroom, as the previous bathroom was very old and in need of replacement. This required a complete reconfiguration of the pipework, which also uncovered some damage to the floor.
The walls were replastered, the floor issue was fixed, and waterproof laminate flooring was laid.
A large plinth was constructed to sit the new shower on, and as the mains water pressure was not adequate for a shower, a pump was used to remedy the issu
Like the look of this? Get in touch for a free quote.
Back to Gallery